Paralleling system

1411build06pASCO Series 336 paralleling system is configured in a standardized, modular design for power-reliability requirements of facilities including small office buildings, healthcare facilities, and grid-support programs. The system is listed and labeled to UL891. As many as four levels of load control maximizes protection for priority one loads by first shedding load levels four, three, and two in order. Loads are added based on actual kW rather than the number of gen-sets, regardless of how many gen-sets are operating.
Emerson Network Power, Florham Park, NJ
website    free information

Comments are closed.